THE CRITICAL PATH

THE CRITICAL PATH

Hassan Khames Eliwa

24,87 €
IVA incluido
Disponible
Editorial:
Eliwa Project Controls Limited
Año de edición:
2026
ISBN:
9781997355267
24,87 €
IVA incluido
Disponible
Añadir a favoritos

Six months late. Fourteen days reported. Eighty-four days to tell the truth.Nadia Farouk is a senior planner who can make any schedule behave. When her company sends her to Dubai to 'tidy the programme' on a troubled 600-bed hospital, she expects a few weeks of formatting. Instead she finds forty-seven date constraints hiding a six-month delay, a project director determined to keep his number, a client moving toward termination, and a contract clock counting down to the day her company’s right to claim expires.To save the project, Nadia must answer three questions that an old forensic delay expert writes on a napkin:Whose delay is it? When did you know? Can you prove it?And she must decide what to do when some of the answers belong to her own company.A business novel and a complete project controls course in one book. Written by a practitioner with more than twenty years in planning, scheduling, delay analysis and construction claims, The Critical Path teaches the way the job is really learned: under pressure, on a real project, with real people. Along the way you will learn:The critical path method (CPM), total float, free float and the longest pathWhy mandatory constraints hide delay instead of removing itHow to read a schedule health check, including the DCMA 14-point assessmentBaselines, progress measurement, earned value management (EVM) and earned scheduleWindows analysis, time impact analysis (TIA) and concurrent delayNotices, time bars and extension of time (EOT) claims under an international standard contract (FIDIC 2017)Resource levelling, recovery planning, and testing and commissioningHow to write a one-page report that a board will actually readEvery chapter ends with a page from the mentor’s notebook, a short summary of what the chapter teaches. The book closes with a 47-term glossary, a lessons-by-chapter index and three ready-to-use tools: a one-page summary template, an Engineer’s programme-review checklist and a list of lessons learned.For planners and schedulers, project managers, construction managers, engineers, quantity surveyors, contract and commercial managers, and students of construction and project management. And for anyone who has ever been asked to hold the dates.

Artículos relacionados

  • Poetry Is Our Ministry to Touch the Heart
    Anelda Lukesia Ballard / Jean Anelda Scott
    Poetry is Our Ministry to Touch the Heart, was birthed when Anelda L. Ballard became ill. God spoke to her in a dream and said 'pick up a pen and write' by being obedient this book was written through the Holy Spirit. Anelda and her mother Jean A. Scott believes that God’s wants to heal a hurting heart. This book will inspire you and encourage you to never give up hope. Jesu...
    Disponible

    12,31 €

  • I soldati lunghi
    Pierluigi Romeo di Colloredo Mels
    Il 24 maggio 1915 il Regno d’Italia entrò nella Grande Guerra, che si sarebbe dimostrata il momento più alto e tragico della sua storia, a poco più di cinquant’anni dalla sua unificazione.In quella lotta tremenda durata quattro anni, la Brigata Granatieri di Sardegna , con i suoi due valorosi Reggimenti, i più antichi del Regio Esercito scrisse, nel grande quadro della guerra d...
    Disponible

    36,66 €

  • Five Beneath Philly
    Susan Bandy / Tom Richmond
    Allen Williams plans to make something of his life and escape South Philly and the work at Cross Brothers’ Meat Packing Plant. He prepares himself with excellent grades and an upcoming full-ride scholarship to climb out of South Philly forever. Then fate changes his whole world. An only son in a family of six, Allen suddenly finds himself responsible for his mother, grandmother...
    Disponible

    20,10 €

  • Forms
    Sharon Welch
    I am an award-winning artist and my works hang in private residences, community hospitals, businesses, and restaurants across the US and also abroad.  I live in Pierre, South Dakota. Since 2008 I have owned Sharon Welch Gallery and Studio where I paint and teach classes.  My theory is have fun, remove the fear of failure, experiment and let the child inside of you play.Very oft...
  • Ricordi di una ausiliaria
    Andrea Lombardi / Raffaella Duelli
    Le memorie di Raffaella Duelli, Volontaria nel Battaglione Barbarigo della Decima Flottiglia Mas iniziano con la partenza del Barbarigo da Roma, narrando la lunga marcia del reparto verso il nord, sotto il mitragliamento degli aerei Alleati. Quindi, è descritta vividamente l'ultima battaglia del Barbarigo sul Fronte Sud, dal Senio a Comacchio: gli appunti di Raffaella, giov...
    Disponible

    31,54 €

  • Why Didn’t You Ask?
    Panya Dixon
    From an early occurrence in her childhood to a perilous thirteen-year relationship, Panya Dixon too often suffered from various forms of physical, emotional, and sexual abuse. Conflicted between love and the pain her loved ones brought on her, she consistently had to fight for her life and her will to move on. Why Didn’t You Ask? is an expression of Panya’s truth—her trials, pa...
    Disponible

    22,82 €

Otros libros del autor

  • The Construction Project Manager’s Handbook
    Hassan Khames Eliwa
    Drawing on more than two decades in project controls across infrastructure and building programmes, The Construction Project Manager’s Handbook brings the full delivery cycle into a single, practical volume - written for the manager who needs an answer today, not a theory to study for later.Eighteen chapters, organised the way a project actually runsFoundations - the role itsel...
    Disponible

    44,47 €

  • PRIMAVERA P6 STEP BY STEP 2026 Edition
    Hassan Khames Eliwa
    Master Oracle Primavera P6 by actually using it. This hands-on 2026 tutorial walks you through building a complete construction project - schedule, logic, resources, costs, baseline, and a real monthly progress update - with 60+ genuine P6 screenshots. No theory dumps, no button tours. One real project, start to finish, and the professional habits that make schedules trusted.St...
    Disponible

    42,93 €

  • Build Your AI Project Manager with Claude
    Hassan Khames Eliwa
    The Complete Hands-On Guide to Creating an AI-Powered Project Management System for Reports, Meetings, Risk, Cost, Delays, Recovery Planning, and Executive Decision Support.Stop spending hours writing reports, analysing risks, preparing dashboards, and documenting meetings. Imagine having an experienced Project Manager, Planning Engineer, Project Controls Manager, Commercial Ma...
    Disponible

    30,19 €

  • CONSTRUCTION PLANNING & SCHEDULING HANDBOOK
    Hassan Khames Eliwa
    Construction projects succeed or fail based on the quality of their planning.Master the fundamentals of construction planning and scheduling through practical examples, visual guides and real-world project controls techniques. Learn WBS development, CPM scheduling, float management, progress tracking, delay analysis, recovery planning and executive reporting in a clear and high...
    Disponible

    29,85 €